[my_unibots_shortcode_1]
CAPE CANAVERAL, Fla. — During a press convention on Tuesday, NASA introduced the new launch date for the Artemis I Launch.
On August 29, an engine gas leak and different points postponed the launch of Artemis I. The mission was to place a crew capsule into orbit across the moon. No astronauts have been on board the rocket.
NASA mentioned Artemis I will now launch on Saturday, September 3. The two hour launch window will open at 2:17 p.m. NASA mentioned they’ll maintain a gathering on Thursday, September 1 to go over the mission plan.
The situation of the gas leak, NASA mentioned, was on Engine #3. The engine wasn’t getting all the way down to the suitable temperature in order that it is not shocked when it ignites. NASA engineers have been additionally attempting to resolve a crack in a vent valve within the interior tank that had by no means been beforehand resolved.
RELATED:
[my_adsense_shortcode_1]
Source link
[my_taboola_shortcode_1]